/ HAMLET

Evolution was contracted to manage the scenic construction for Theatre Mitu’s production of “Hamlet” at NYU Abu Dhabi. In this performance, Theater Mitu challenged the boundaries between classical adaptation and contemporary performance with this site-specific, hyper-theatricalised production.

Our technical and scenic teams collaborated to create a unique, custom built, multi-levelled structure, with integrated lighting and technical elements to creatively transform the look and feel of the stage set throughout the different scenes of the performance.

BACK TO PORTFOLIO